•If a job is rescheduled earlier than calculated by the system (moved to the left by drag & drop), the icon changes into a diamond and the color becomes green. •If a job is rescheduled later than calculated by the system (moved to the right by drag & drop), the icon changes into a diamond and the color becomes red. •If a job is rescheduled but the new planning date is rejected by the office, the icon changes into a triangle. It's color is green or red as in above cases. |
There are 2 ways to reschedule a job:
First option: by editing
1.Load and read the jobs calendar 2.Select the icon of an automatically scheduled or manually added job execution in the calendar. 3.Click "Edit" button. 4.You may change now the scheduled date. Alternatively you may extend the interval by running hours (RH extend) . ->Maximum extension of RH is 9999
5.Select the "Reason for rescheduling" (e.g. Dry dock).
If none of the reasons in the drop down field fits, enter the reason into the remark field. 6.You may choose the person by which the job has to be carried out. 7.Click "Save" button . Second option: by Drag & Drop
1.Load and read the jobs calendar 2.Select the icon of an automatically scheduled job execution in the calendar. 3.Drag & drop the icon to the new date. 4.Enter the reason for the rescheduling in the pop up dialog. |