Create new part level maintenance activity across fleet |
Top Previous Next |
|
This procedure explains how to set up an activity for parts, i.e. on part level. If you enable an activity here, then by default it will be enabled for all parts of the corresponding product type in your fleet. If some corresponding parts of your fleet's vessels do not need a particular activity or an activity which must be further adapted for individual parts on corresponding products on certain vessels, you can disable or adapt it later here. Important information about editing and deleting activities across your fleet: •If you edit a job across your fleet, then the new settings are applied to all vessels for which the job is enabled and for which the new settings do not concern settings which have been individualized for specific vessels. •If you delete a job across your fleet, then the job is deleted on all vessels, for which the job is enabled and regardless whether some settings have been individualized for specific vessels. 1.Go to menu "Maintenance" > "Admin jobs fleet". 2.Select a product in the IDM tree on the very left of the screen. On the right side, you will see a table "Job settings for parts of '____'" showing all existing maintenance activities across your fleet on part level. 3.Click "Load all parts" . 4.Select a part in the upper right table. This will list all existing maintenance activities for that part in the lower right table if there are already. Existing activities are also shown with an icon in the column "Activities". If there are no activities yet, set the ticker in the column "Job" and click on "Save". 5.Click the button "Add" below the table "Job activities". This will open a form called "Details", which allows you to set up the new maintenance activity. 6.Fill in the details form according to the explanations in Description of PMS settings. 7.Click "Save" . 8.If you need to add one or several documents, select the relevant job and click "Select instructions". Documents are managed through the DMS. 9.If you need to assign a specific job card to the maintenance activity, select the corresponding job and click "Select JC". Choose a job card in the column "Selection" and click "OK".
Create maintenance activities on engine columnsYou may create jobs on a part that multiplied in part management for each column/unit of an engine (e.g. piston 1-8). Theoretically you can create maintenance activities on several columns for any machinery on board. Practically this function is used on the main- and sometimes auxiliary engines only.
if a part is changed in part is replaced in part management.
|